Criticism & Suggestions Responses

2024

January

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status

February

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
Missed the KRS registration schedule. Is there any chance to reopen the KRS registration for me, or can I fill it out during the KPRS?
2024-02-05 : 10:11:46
Academic
please fill in the KRS at the time of KPRS
2024-03-08 : 05:33:33
Edo
Finished
2
The faculty of Science and Technology is not fully implementing technology as expected. There is a need for elevator facilities to support individuals with disabilities or temporary injuries, especially elderly lecturers and students who struggle with stairs. Additionally, classrooms should be regularly checked for basic teaching tools like erasers and markers, and the condition of cables connecting laptops to projectors. Technological facilities are still very limited.
2024-02-20 : 10:37:22
Facilities and Infrastructure
It has been conveyed to stakeholders at FST
2024-03-08 : 05:32:31
Yuna
Finished
3
The BLM FST website account has been suspended
2024-02-29 : 01:05:40
Student Affairs Division
Thank you for the information. We will report this to USI FST regarding the issue
2024-03-06 : 08:02:54
Edo
Follow Up

March

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The air conditioner in the computer lab on the 2nd floor (LKMAT 5/202A) makes loud noises, disrupting the teaching and learning process.
2024-03-05 : 03:36:25
Facilities and Infrastructure
already repaired
2024-10-11 : 10:07:54
Aldo
Finished
2
All lights in the women’s restroom near room 321 are broken. The water taps are also damaged
2024-03-14 : 01:01:14
Facilities and Infrastructure
already repaired
2024-10-11 : 10:07:32
Ado
Finished

March

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The air conditioner in the computer lab on the 2nd floor (LKMAT 5/202A) makes loud noises, disrupting the teaching and learning process.
2024-03-05 : 03:36:25
Facilities and Infrastructure
already repaired
2024-10-11 : 10:07:54
Aldo
Finished
2
All lights in the women’s restroom near room 321 are broken. The water taps are also damaged
2024-03-14 : 01:01:14
Facilities and Infrastructure
already repaired
2024-10-11 : 10:07:32
Ado
Finished

April

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
There is no drinking water provided, all power outlets in the biology gazebo are completely non-functional.
2024-03-05 : 04:36:09
Facilities and Infrastructure
Thank you for your complaint, we will follow up immediately
2024-05-07 : 02:43:21
Coordinator
Read
2
A staff member transferred to the Mathematics Department is underperforming; the shared room in R205 is not being cleaned, and the carpet and floor are dirty.
2024-04-08 : 12:37:45
Staffing
Thank you for your input. we will convey it to the leadership
2024-05-07 : 02:45:04
Coordinator I
Follow Up
3
Microphone in room 320 FST is not working
2024-04-24 : 12:10:04
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:06:03
Aldo
Finished
4
The door hinge in the restroom near room 101 is broken
2024 04-26 : 03:06:59
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:05:41
Aldo
Finished

May

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The storage cabinet in the Biophysics Lab is decayed and damaged; it needs to be repaired or replaced. Twelve lockers have broken locks and need to be fixed
2024-05-03 : 01:57:24
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:05:13
Aldo
Finished
2
The sink in the men’s restroom on the 3rd floor near lecture room 307 is clogged and not functioning
2024-05-06 : 09:21:09
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:04:33
Aldo
Finished
3
The screen frequently used for sharing lecture materials in Labkom Room 2 flickers several times per minute, disrupting the class
2024-05-07 : 04:09:02
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:03:18
Aldo
Finished
4
PD Dikti information has not been updated yet, which is required for the PPG Prajabatan registration.
2024-05-07 : 09:58:07
Student Affairs Division
Assistance has already been provided by Student Affairs and the Academic and Student Administration (PAA) of the program.
2024-11-11 : 09:58:07
Coordinator
Finished
5
The light in the toilet near the research sub-division is not working
2024-05-07 : 12:09:25
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:04:11
Aldo
Finished
6
The air conditioner in the lecturer’s room at the Biophysics Lab is not cooling properly
2024-05-08 : 08:53:21
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:02:52
Aldo
Finished
7
Provide a water gallon, students need to refill their drinking water
2024-05-15 : 05:10:27
Facilities and Infrastructure
We suggest that student representatives discuss this need directly with the leadership for further clarification
2024-06-07 : 10:44:25
Coordinator
Follow Up
8
The Wi-Fi signal does not reach the Integrated Biology Laboratory
2024-05-16 : 01:30:56
Facilities and Infrastructure
It has been improved for WIFI problems
2024-10-11 : 10:02:22
USI Team
Finished
9
The light in the restroom next to room 322B is not working
2024-05-22 : 01:14:29
Facilities and Infrastructure
it has been replaced with a new one
2024-10-11 : 10:01:35
Aldo
Finished
10
The power outlets at the front of the Student Center, in the northeast and southeast corners, are not working
2024-05-30 : 12:41:00
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:00:40
Aldo
Finished

June

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The air conditioner in the Biophysics Lab is completely non-functional
2024-06-07 : 04:53:09
Facilities and Infrastructure
already repaired
2024-10-11 : 10:00:20
Aldo
Finished
2
The lights in the restrooms on the second floor of the Physics side, both male and female, are not working
2024-06-12 : 06:21:18
Facilities and Infrastructure
Already repaired
2024-07-07 : 05:06:41
Facilities and Infrastucture Coordinator
Finished

July

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status

August

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The lock on the inner laboratory door was broken.
2024-09-02 : 08:35:06
Facilities and Infrastructure
Already repaired
2024-09-13 : 11:01:56
Facilities and Infrastructure Coordinator
Finished
2
Please upgrade the WiFi. It can’t be used. It lags badly.
2024-09-11 : 03:19:06
Facilities and Infrastructure
Regarding the Wi-Fi, this falls under the university’s responsibility, so the authority to address it lies with the university. However, we have followed up with them. Please wait for further updates.
2024-09-20 : 08:51:14
IT Coordinator
Finished
3
The restroom door on the third floor can only be opened halfway, it is stuck
2024-09-12 : 04:50:32
Facilities and Infrastructure
Already repaired
2024-10-11 : 09:56:11
Aldo
Finished
4
The air conditioner in Prof. Suryani’s room cannot be turned on
2024-09-20 : 08:26:10
Facilities and Infrastructure
Already repaired
2024-10-11 : 09:57:31
Aldo
Finished
5
The electrical outlet in the gazebo is not connected and does not work
2024-09-27 : 11:56:34
Facilities and Infrastructure
Already repaired
2024-10-11 : 10:02:52
Aldo
Finished

September

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The location of the e-complaint (suggestion) on the new FST website cannot be found
2024-08-05 : 10:04:34
DEKANAT
It has been fixed. Please check it on the web.
2024-10-15 : 09:39:31
IT Coordinator
Finished
2
I hope that the orientation program (OSPEK), which is routinely held for new students, can be discontinued, as it offers little benefit beyond stress and unnecessary exhaustion. The overwhelming and often pointless assignments are a waste of time, energy, and money, and they generate excessive trash from the leftover props. Please stop giving us tasks with unreasonably short deadlines that don’t match their workload, and do not require us to wear specific outfits or attributes that we do not own.
2024-08-21 : 11:20:49
Student Affairs Division
OSPEK 2025 will be better than this year. Thank you for your feedback regarding this year’s orientation program.
2024-11-11 : 09:59:47
Coordinator
Finished
3
The elevator access on the second floor of the Pertamina building is not working
2024-08-21 : 12:17:32
Facilities and Infrastructure
Already repaired
2024-10-11 : 09:59:20
Aldo
Finished
4
Room 306 is not equipped with a microphone, and the air conditioner is not cooling
2024-08-27 : 04:38:32
Facilities and Infrastructure
Already repaired
2024-10-11 : 09:58:12
Aldo
Finished
5
The projector in classroom 307 is unclear and needs to be replaced immediately
2024-08-28 : 02:00:27
Facilities and Infrastructure
Already repaired
2024-10-11 : 09:55:01
Aldo
Finished

October

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The AC timer in room 210 cannot be turned off, the AC is not cooling properly, and one light is out
2024-10-09 : 04:35:26
Facilities and Infrastructure
Already repaired
2024-10-18 : 12:22:32
Aldo
Finished
2
One of the air conditioners in the transit room of Lab 303 in the Pertamina building is not working, making the room very hot.
2024-10-14 : 12:59:07
Facilities and Infrastructure
The Air Conditioner has been replaced with a new one
2024-10-18 : 12:23:26
Facilities and Infrastructure Team
Finished
3
The air conditioner in the lecturer’s room at the Electronics Lab on the second floor makes noise when turned on. Please assist with the repair.
2024-10-18 : 10:12:50
Facilities and Infrastructure
Already repaired
2024-10-18 : 10:51:08
Facilities and Infrastructure Coordinator
Finished
4
The air conditioner in the Physics lecturer’s room on the third floor (R303) is not cooling.
2024-10-28 : 03:37:46
Facilities and Infrastructure
Already repaired
2024-11-06 : 03:21:07
Aldo
Finished
5
The air conditioner in the S2 Biomedical Engineering program room is not cooling
2024-10-29 : 02:01:55
Facilities and Infrastructure
Already repaired
2024-11-06 : 03:20:18
Aldo
Finished

November

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status
1
The LCD screen in the S3 MIPA study room does not have a dedicated cable, so sometimes another cable needs to be plugged in for the LCD screen to turn on
2024-11-06 : 11:06:25
Facilities and Infrastructure
Already repaired
2024-11-12 : 03:21:17
Aldo
Finished
2
The Wi-Fi in the S2 Biomedical Engineering program room is not working
2024-11-12 : 01:50:09
Facilities and Infrastructure
Already repaired
2024-11-12 : 03:21:32
Aldo
Finished
3
The LCD screen display in room 312 is too small, making it unsuitable for such a large classroom
2024-11-18 : 09:35:12
Facilities and Infrastructure
We will discuss it
2024-11-18 : 09:43:22
Aldo
Follow Up

December

No Complaint Complaint Datetime Complaint Area Follow Up Follow Up Datetime PIC Status